2025 · CBT 2
Afternoon
Electrician
ALP CBT-2 Previous Year Question 2025-05-02 Afternoon Shift Electrician
173 questions
120 min
173.0 marks
Your score
0 / 0
0 correct
0 wrong
0 skipped
11
Part A
+1.0M
-0.33M
Samir takes 6 days to complete a piece of work, while Tanvir can complete it in 8 days. If Amir also joins them, together, the trio can complete the entire work in 3 days. If a total sum of ₹2,400 is to be paid for the job, how much will Amir receive for his contribution?
12
Part A
+1.0M
-0.33M
Which of the following statements is correct?
13
Part A
+1.0M
-0.33M
The list price of an article is 5,100 and a discount of 32 is offered on the list price. What additional discount per cent on the already discounted price must be offered to a customer to bring the net selling price to 1,734?
14
Part A
+1.0M
-0.33M
Generally, what is the process of heat transfer in liquids?
15
Part A
+1.0M
-0.33M
Mechanical energy is the sum of___________
16
Part A
+1.0M
-0.33M
The resistance of a particular material wire with length L and cross-sectional area A is 2 Ω. What would be the resistance of another wire of the same material having length 2L and area of cross-section A/2?
17
Part A
+1.0M
-0.33M
The resistivity of a conductor depends on the___________.
18
Part A
+1.0M
-0.33M
A bulb is connected across a battery of 10 V for 20 seconds. If a current of 2 A flows through it, calculate the heat energy generated by the bulb.
19
Part A
+1.0M
-0.33M
In a certain code language, while you wait is coded as ns bg sp and why wait now is coded as kc rw bg. How is wait coded in the given language?
20
Part A
+1.0M
-0.33M
Select the option that is true regarding the following two statements labelled Assertion (A) and Reason (R). Assertion (A): It is safe to work under a suspended load if you are in a hurry. Reason (R): Never exceed the safe working load (SWL) of the equipment you are using.