151
part B
+1.0M
-0.33M
_________________type of relay is preferred for phase fault on short transmission line.
152
part B
+1.0M
-0.33M
‘Which of the given motors has the poorest speed control?
153
part B
+1.0M
-0.33M
Insulator rings used for electricity delivery poles are made of
154
part B
+1.0M
-0.33M
Among the following, which meter is regarded as insulation tester?
155
part B
+1.0M
-0.33M
What should be the insulation resistance between the body of the electrical water heater and the connecting cable as per IS1?
156
part B
+1.0M
-0.33M
The function of thermostat in an electric oven is to control the
157
part B
+1.0M
-0.33M
Transformers of rating above 500 KVA are called
158
part B
+1.0M
-0.33M
During installation of a generator. one must carefully ensure that the generator terminals and all control wirings are correct so that the order of ____________matches the system.
159
part B
+1.0M
-0.33M
Which of the following method CANNOT be used to reduce earth’s resistance?