2025 · CBT 2
Morning
Electrician
ALP CBT-2 Previous Year Question 2025-05-02 Morning Shift Electrician
174 questions
120 min
174.0 marks
Your score
0 / 0
0 correct
0 wrong
0 skipped
161
Part B
+1.0M
-0.33M
What is the sum of (3/8) + (5/12) ?
162
Part B
+1.0M
-0.33M
What is the main purpose of continuity testing in a DC generator?
163
Part B
+1.0M
-0.33M
Which of the following statements is NOT true if any electrical system is not properly earthed?
164
Part B
+1.0M
-0.33M
What is the purpose of an emergency evacuation plan?
165
Part B
+1.0M
-0.33M
Which of the following is a key safety measure to follow when installing an earthing system?
166
Part B
+1.0M
-0.33M
IEEE 80 provides recommendations for .
167
Part B
+1.0M
-0.33M
Why is armature resistance control NOT suitable for speed control in high-power DC motors?
168
Part B
+1.0M
-0.33M
When using a multimeter to measure current, which of the following is correct?
169
Part B
+1.0M
-0.33M
What is the basic working principle of a DC generator?
170
Part B
+1.0M
-0.33M
In a balanced star-connected system, the neutral point .