Skip to main content
FocusedTaiyari logo FocusedTAIYARI
Technical Trade

Electrician

300 questions · 1 topic

300 questions
281 Mixed Easy PYQ
+1.0 -0.33
The correct instant of synchronising is when busbar and incoming machine voltages are of _________ magnitude and have ___________ frequency.
282 Mixed Easy PYQ
+1.0 -0.33
Which of the following is a possible cause of an unbalanced load in a three-phase system?
283 Mixed Easy PYQ
+1.0 -0.33
What is the unit of measurement for earth fault loop impedance?
284 Mixed Easy PYQ
+1.0 -0.33
The RMS value of emf per phase of alternator is given by _______. (Given: Φ = flux per pole, f = frequency of induced emf, T is the number of coils or turns per phase and Z is the number of conductors or coil sides in series/phase in an alternator
285 Mixed Easy PYQ
+1.0 -0.33
What is the primary purpose of shielding in electrical cables?
286 Mixed Easy PYQ
+1.0 -0.33
While performing short circuit test on a transformer to determine its parameter, instruments are placed on the:
287 Mixed Easy PYQ
+1.0 -0.33
Which of the following conversions are correct?
288 Mixed Easy PYQ
+1.0 -0.33
What should be the position of the ‘OFF’ marking on a fireman’s switch?
289 Mixed Easy PYQ
+1.0 -0.33
What is the primary goal of the 5S concept?
290 Mixed Easy PYQ
+1.0 -0.33
Which of the following statements is/are true about Non-Functional Dimensions (NF) in engineering drawing? Statement 1: Non-functional Dimensions are shown without limits, as they do not affect the functionality of the component or space. Statement 2: Non-Functional Dimensions are typically used for reference purposes only, and do not impact the assembly or performance of the component or space.